Masterplan Optimiser

Finalising the Schedule

After reviewing the optimisation results and confirming you are satisfied with the assignments, the schedule can be finalised. Finalising locks in the solver's output and prepares it for publishing.

How to Finalise

On the Optimisation tab, click Finalize in the toolbar. This converts the optimised assignments into the final state. The project status badge changes to finalised (blue).

Manual Adjustments

Even after finalising, individual tasks can still be fine-tuned:

  • Click a task to open the optimised task edit modal. This shows both the optimised values and the final values side by side, allowing last-minute corrections.
  • Right-click a task to open the person replacement menu and swap an assigned person for another.

Note: Manual adjustments after finalising are not re-validated by the solver. Ensure changes do not introduce conflicts such as double-booking a person.

Re-optimising

If broader changes are needed, you can return to the optimisation tab and run the solver again. This overwrites the current optimised assignments. You will need to finalise again afterwards.